
60+ built since 2010
Steel Bridges
Since 2010 we have built more than 60 steel bridges across Sarawak — for timber and plantation companies working where there is no road, no crane and no concrete plant within a hundred kilometres.
They are not a catalogue of different bridges. It is one proven design — what changes from crossing to crossing is the span, the deck width and the load rating, which we set to the site.
We fabricate the structure at our yard, transport it in, and erect it on site. The nine projects below are a sample from the 2014–2015 period.
A sample of projects
| Bridge | Location | Completed |
|---|---|---|
| 12' × 26' × 20 tons | Balingian | 26.03.2015 |
| 48 m × 13½' | Kanowit | 11.12.2014 |
| 12 m × 13½' × 50 tons | Tatau | 30.10.2014 |
| 25' × 11' × 20 tons | Balingian | 17.07.2014 |
| 50' × 13½' × 50 tons | Bintulu | 04.07.2014 |
| 12 m × 13½' | Tatau | 21.03.2014 |
| 50' × 13½' × 50 tons | Nan Man, Sibu | 10.03.2014 |
| 12 m × 13½' × 50 tons | Selangau | 04.02.2014 |
| 36 m × 13½' | Tanjung Manis | 24.01.2014 |
Client names are omitted for confidentiality. We can provide references on request.


Talk to us
The quickest way to reach us is WhatsApp. Tell us the load, the road and the axle count you have in mind, and we will come back with a specification.